A residential brick extension documented stage by stage, from groundwork and drainage through to the finished exterior.
This project follows a residential brick extension through each construction stage, starting with excavation and drainage before foundations were laid.
From there the brickwork and main structure were built up, followed by the roof construction, insulation and the finished roofing and exterior.
The full build is documented below with 19 genuine site photographs in build order, alongside two original construction videos.
Nineteen genuine site photographs document this build from the original property through to the completed exterior. Select any photo to view it full screen.
Excavation and site preparation at the start of the build.
Drainage runs and chamber installation.
Foundations, oversite and damp-proof membrane forming the base of the extension.
Brickwork and the main structure of the extension taking shape.
Timber roof structure, battens and membrane.
Roof and floor insulation installed inside the new structure.
The finished roof covering.
The finished extension alongside the original house.
Two original construction videos from this project, playable here.
Tell CIN Construction Ltd about your extension or renovation plans and we'll provide a free, no-obligation quote.